sand well

  • sand well
  • 释义

    出砂油井

纠错 数据更新时间:2026-04-19 17:25:21
1、

Finally, the stream flow field and sand flow field models are discretized, and nucleation, growth and moving process of sand ripple are simulated well with comparing experimental results.

最后,对气流场和沙流场模型进行离散化处理并很好地模拟了气流场和沙流场作用下的沙纹生成、增长、移动过程并其数值模拟结果与现场试验结果进行了对比分析。

互联网摘选

2、

I think that China Construction Bank gets stuck handling Zhang , where sand well can handle?

我想办张中国建设银行卡,沙井在哪里可以办?

互联网摘选

3、

Make natural and soft soil knot, adopt beat sand well or plastics catchment plank method for carrying preparing pressings, in soft handle design of the engineering with construction practice, get expansion already and gradually with apply.

使天然软土固结,采用施打砂井或塑料排水板堆载预压的方法,在软基处理工程的设计和施工实践中,已逐步得到推广和应用。

互联网摘选

4、

Sand production of oil well and gas well is an important problem encountered during oil production.

油气井出砂是石油开采遇到的重要问题之一.

网络文摘精选

5、

According to Shu3 reservoir geology and sanding status, we decide to treat oil well sand production by deep sand control process.

根据曙三区油藏地质特征和出砂状况,确定在该区块应用深部防砂工艺治理油井出砂。

互联网摘选

6、

The camel's feet, well adapted for dry sand, are useless on mud.

骆驼的蹄子虽然非常适合于在干沙上行走,碰到泥泞时却无计可施。

《柯林斯高阶英汉双解学习词典》

8、

The main energy resources are crude oil, natural gas, coal, tar sand, biomass and other renewable energy resources such as solar energy, tidal and wind power, as well as large hydroelectric potential.

尼日利亚拥有丰富的能源资源,主要的能源资源是原油、天然气、煤炭、沥青砂、生物能源和其他可再生能源如太阳能、潮汐、风力发电以及大型水力发电。

互联网摘选

9、

As this collection of photographs shows, the pigs are remarkably well adapted to their beach bum lifestyle of frolicking the water and lazing on the sand.

从这组照片中我们可以看到,这些小猪非常适应海滩流浪汉的生活,它们悠游自在地戏水,躺在沙滩上消磨时光。

互联网摘选

10、

The sluicing chamber type water diversion hub is the "side water diversion, front sand sluicing" type that is well to prev.

冲沙槽式引水枢纽是一种常见的“侧面引水,正面排沙”引水枢纽型式,其引水防沙效果良好。

互联网摘选

11、

Sand plug always occurred during fracturing in slant well or directional well.

斜井或定向井在压裂过程中,经常因出现砂堵导致施工失败.

互联网摘选

12、

According to the properties of Pinghu oilfield in East China Sea, the well completion method of A3 horizontal well is determined as initial well completion by slotted liner and later sand control by metal fibre screen pipe.

针对东海平湖油田的特点,确定了该油田A3水平井合理的完井方法是:割缝衬管先期完井和金属纤维防砂筛管后期防砂。

互联网摘选

  • 相关词组
  • 今日热词
  • 热门搜索

英语网英语词典(dict.25820.com)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈